1 / 5
The squad was asked to ___ the dark mode feature by end of sprint.
-
-
-
-
You implement a feature. Implement is the precise technical collocation; the others are informal or incorrect. So implement a feature.
2 / 5
After a successful canary, we decided to ___ the feature to production.
-
-
-
-
You ship to production. Ship is the standard engineering collocation; the others do not carry the same precision. So ship to production.
3 / 5
The product team plans to ___ the new onboarding flow to 10% of users first.
-
-
-
-
You roll out a feature. Roll out is the precise collocation for gradual releases; the others do not fit. So roll out a feature.
4 / 5
We will ___ the new checkout UI against the existing one to measure conversion.
-
-
-
-
You A/B test a feature. A/B test is the standard product-engineering collocation; the others are informal or incorrect. So A/B test.
5 / 5
To limit risk, we can ___ a feature and enable it only for beta users.
-
-
-
-
You flag a feature. Flag is the precise collocation in feature-flag workflows; the others do not fit. So flag a feature.